Daily maintenance of the transformer!

Release date:2018-12-20 17:12:31
In order to protect the insulation performance of the high-voltage generator and the insulating oil installed in the machine head, generally do not open the observation window and loosen the surrounding fixing screws to prevent the oil from absorbing moisture or falling dust and reducing the insulation performance.
 
2. Check the surrounding lighting, heat dissipation and dust removal equipment of the transformer, and wipe off the dust on the low-frequency toroidal transformer body and the porcelain bottle with a clean cloth.
 
3. Check the high-voltage side load switch of the transformer to ensure flexible operation, good contact, and lubrication treatment of the transmission part.
 
4. Pull open the high-voltage grounding knife and check that the grounding is in the disconnected position. Close the high-voltage load switch, let the transformer test run, and remove the high-voltage side identification plate. Pay attention to the high-voltage load switch when disconnecting or closing the transformer. There must be more than two people.
 
5. When it is necessary to replace the new oil, the local power department should be assisted to check the performance of the new oil, and the insulation strength should be no less than 25000 volts / 2.5 mm; and the oil insulation strength in the combined head should be 30,000 volts / 2.5 mm or more.
 
6. Measure the insulation resistance of the high and low voltage coils of the transformer (ground and phase) with a 2500V shaker. Confirm that the requirements are met. (At room temperature 30 °C, the high voltage side of the 1OKV ??transformer is greater than 20MΩ, and the low voltage side is greater than 13MΩ. Before the test, it should be connected. Good grounding wire, after the measurement is completed, it should be discharged.
 
7. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing, and the outer grounding wire are conducting, and tighten the grounding bolt.
 
8. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing and the external grounding wire are conducting, and tighten the grounding bolt.

Article keywords:
QR code
主站蜘蛛池模板: 成人福利在线 | 亚洲美女视频在线 | 日韩欧美中字 | 欧美疯狂爱爱免费视频 | 国产黄三级三·级三级 | 美女直播毛片 | 日本一二三不卡视频 | 福利片在线看 | 欧美黄色大片网站 | 国产一级做a爰片... | 国产精品亚洲一区二区在线观看 | 成人在线免费观看视频 | 一二三四在线播放免费视频中国 | 综合久久五月天 | 波多野结衣视频在线免费观看 | 亚洲在线国产 | 日本欧美中文 | 欧美一区视频在线 | 免费看一级a一片毛片 | 在线观看www日本免费网站 | 亚洲综合精品一区 | 亚洲图片在线 | 午夜在线亚洲 | 人与动人物欧美网站 | 一级特黄性色生活片一区二区 | 国产区在线观看视频 | 看看的在线视频国产 | 日韩精品一区二区在线观看 | 国产八区| 国产v综合v亚洲欧美冫 | 在线观看视频亚洲 | 欧美一区二区三区在线可观看 | 99手机在线视频 | 国产a自拍 | 无码中文字幕乱在线观看 | 国产精品久久久久久久免费大片 | 久久中文精品 | 欧美日韩精品一区二区免费看 | 国产色视频在线观看免费 | 99re6在线视频免费精品 | 欧美日本一道高清二区三区 |