Your location:Home>>industry

11 points that must be paid attention to when installing the transformer

Release date:2018-12-20 17:13:54

11 points that must be paid attention to when installing the transformer


1. Reasonably choose the installation location of the distribution transformer:
The installation of the distribution transformer should meet the requirements of the user's voltage, and try to avoid installing the distribution transformer in the barren hills, which is vulnerable to lightning strikes and away from the residential area. This is not convenient for the maintenance personnel to maintain regularly, and it is not convenient for the staff to manage. .
2. Reasonably choose the capacity of the distribution transformer
It is also very important to choose the capacity of the distribution transformer reasonably, which can not cause the load of the distribution transformer to burn out, nor can it cause the waste of the big horse-drawn trolley type. According to the user load situation, the capacity should be counted and the distribution transformer capacity should be reasonably selected.
3. Strengthen the measurement of power load
During the peak period of power load, the load of each distribution transformer should be strengthened. If necessary, increase the number of measurements. The distribution transformer that does not meet the three-phase current should be adjusted in time to prevent the neutral current from being too large and easy to blow the lead. Causes the user equipment to burn out.
4. Avoid installing a low-voltage metering box on the distribution transformer.
The low-voltage metering box installed on the distribution transformer station area of ??the remote mountainous area should be gradually removed, and changed to indoor installation as much as possible.
5, reasonable allocation of distribution transformer high and low temperature melting point electrical melting
The melt distribution of the high and low voltage fuses of the distribution transformer is unreasonable, which may cause serious overload of the distribution transformer and burn out the distribution transformer. The high and low pressure melt configuration shall be followed by: a fuse body with a capacity of 100 kV·A or less and a fuse body with a rated current of 2.0 to 3.0 times; and a transformer with a capacity of 100 kV·A or more with a melt of 1.5 to 2.0 times the rated current; The low-voltage side fuse should be configured slightly larger than the rated current.
6, should not adjust the tap changer privately
Due to the difference in power load between winter and summer, the voltage level is slightly different. In order to meet the voltage demand, some rural electricians randomly adjust the tap changer without performing related tests, causing the tap changer to be out of position, causing phase-to-phase short-circuit and burnout. Electric transformer.
7, distribution transformer high and low installed insulation cover
In order to prevent natural disasters and external damage, if necessary, install high and low voltage insulation covers for the narrow roads and forest protection areas to prevent the low voltage short circuit from burning the transformer on the distribution transformer.
8. Arrest arresters should be installed on the high and low voltage sides of the distribution transformer.
Lightning arresters should be installed on the distribution transformers in the multi-mine area. If the quality of the arrester is unqualified or the fault is not replaced in time, it is easy to be attacked by lightning. During the thunderstorm season, the arrester should be sent to the repair department for testing and timely installation. It is forbidden to use unqualified products.
9. Regularly measure the grounding resistance of the distribution transformer
After long-term operation of the distribution transformer (especially the grounding lead is replaced by aluminum wire), severe oxidation occurs, the grounding resistance increases, and the buried grounding body is rusted and broken, causing the neutral point potential to shift. When lightning strikes or overvoltages , easy to cause an accident. According to the regulations, the grounding device should meet: the grounding resistance of the distribution transformer below 100kV·A is not more than 10Ω, and the grounding resistance of the distribution transformer above 100kV·A is not more than 4Ω.
10. Strengthen daily management
Regularly patrol the line, cut down trees, prevent the branches from hitting the wires and causing a low voltage short circuit to burn the distribution transformer. The lack of daily management of the distribution transformer by the staff makes the transformer run out of oil for a long time. The end of the respirator is installed or the silica gel is not replaced in time, so that the distribution transformer is flooded and easily caused accidents. There are quality problems in the distribution transformer itself. Because the distribution transformer is installed far away, some construction personnel put the untested distribution transformer into operation, temporarily use electricity, and burn out the transformer.
11, regularly check the distribution transformer low voltage lead
It is strictly forbidden to use the wire itself to make the wire nose directly on the low-voltage pile head of the distribution transformer. It is necessary to regularly check and strengthen the joint between the lead wire and the distribution transformer pile head to prevent the low-voltage pile head of the distribution transformer from being burnt due to loosening.

Article keywords:
Previous article:No last one Next article:What are the functional characteristics ...
QR code
主站蜘蛛池模板: 国产精品视频福利视频网 | 日本不卡一区二区三区视频 | 亚洲一区二区免费在线观看 | 五月天爱爱视频 | 国产精品三区四区 | 97视频久久 | 国产香港特级一级毛片 | 亚洲一区精品伊人久久伊人 | 国产欧美日韩综合在线一 | 亚洲日本一区二区三区高清在线 | 毛片免费在线视频 | 黄视频在线观看免费视频 | 日韩欧美一区二区久久黑人 | 国产h肉在线视频免费观看 国产h视频在线观看网站免费 | 一级黄色a级片 | 美国免费毛片 | 青青99| 免费的特黄特色大片在线观看 | 日本中文字幕精品理论在线 | 青草草视频在线观看 | 国产毛片一级 | 91精品视频免费观看 | 毛片在线看片 | 国产精品视频永久免费播放 | 欧美激情爱爱 | 毛片网站在线观看 | 欧美在线观看一区二区三 | 一级欧美一级日韩毛片99 | 黄视频免费观看 | 福利社午夜影院 | 免费69视频 | 青草青草久热精品观看 | 亚洲婷婷六月 | 我想看一级毛片 | 在线不欧美| 亚洲国产一区二区三区 | 国产91精品黄网在线观看 | 午夜在线视频国产 | 亚洲视频在线观看网站 | 国产精品麻豆久久久 | 日韩 欧美 亚洲 |