Hunan Peng bathroom safe choice
Your location:Home>>industry
11 points that must be paid attention to when installing the transformer[2018-12-20] 11 points that must be paid attention to when installing the transformer

1. Reasonably choose the installation location of the distribution transformer:The installation of the distribution transformer should meet the requirements of the users voltage, and try to avoid installing the distribution transformer in the barren hills, whi...

[2018-12-20] What are the functional characteristics of the transformer?

Transformers are used in electrical equipment and wireless circuits. Transformers are often used for lifting voltage, matching impedance, and safety isolation. In the generator, whether the coil motion passes through the fixed coil through the magnetic field o...

[2018-12-20] What should be paid attention to in the design of high frequency transformer skeleton?

When designing the structure of the high-frequency transformer, it should be based on the drawings or samples provided by the customer, plus its own design experience, try to design the model in 3D, avoid the defects of 2D drawing and modification, and then gr...

[2018-12-20] The capacity selection of the transformer should be reasonable

If the capacity of the transformer is too large, it will not only increase the initial investment, but also make the transformer run at no load or light load for a long time, so that the proportion of no-load loss increases, the power factor decreases, and the...

[2018-12-20] Test transformer type

Transformers have their own test, called test transformers, which can be divided into inflatable, oil-immersed, dry and other test transformers, which are used by power plants, power supply bureaus and research institutes. The basic test equipment for the with...

[2018-12-20] Analysis of the voltage ratio of the transformer

The number of turns of the two sets of transformers is N1 and N2, N1 is the primary and N2 is the secondary. An alternating voltage is applied to the primary coil, and an induced electromotive force is generated at both ends of the secondary coil. When N2N1, t...

[2018-12-20] The embodiment of transformer market competition

The competition in the transformer market is mainly in two aspects. From the users point of view, it is the performance and quality of the product. From the perspective of the industry, it is the cost control. The two aspects are complementary. At present, use...

[2018-12-20] Common faults and daily inspections and maintenance of large transformers

The specific reasons for causing a transformer to explode are generally the following:1. Winding insulation damage causes a short circuit, causing a fire or explosion accident(1) Winding insulation aging, deterioration, and insulation strength are reduced. In ...

[2018-12-20] Representative meaning of transformer letters and numbers

The role of the transformer-related symbols, and the relevant transformer model is generally composed of letters and a string of numbers, so what is the difference between these letters and numbers? In general, the transformer model consists of a symbol indica...

HomeUp1NextEnd  Goto??Page?
QR code
主站蜘蛛池模板: 日本三区四区免费高清不卡 | 国99久9在线 | 免费 | 91综合视频 | 久久中文字幕综合不卡一二区 | 一二三四视频6+1在线观看免费 | 曰本女人一级毛片看一级毛 | 久青草免费视频 | 精品免费久久 | 国产一区二区高清在线 | 香蕉视频在线观 | 日本mm高清在线观看免费视频 | 国产三级一区二区三区 | 欧美日韩免费在线观看 | 午夜免费视频网站 | 在线播放亚洲视频 | 免费视频爱爱太爽在线观看 | 日韩精品视频一区二区三区 | 你懂得国产 | 久久久久国产一级毛片高清版 | 国产精品第二页 | 日本韩国视频在线观看 | 久色一区| 国产亚洲欧美一区 | 人人舔人人爱 | 欧美三级a做爰在线观看 | 亚洲三级黄 | 欧美大胆一级视频 | 亚洲悠悠色综合中文字幕 | www视频在线观看免费 | 亚洲视频在线观看地址 | 一二三四在线播放视频国语高清观看免费 | 视频一区国产精品 | 日本精品久久久中文字幕 | 亚洲 美腿 欧美 偷拍 | 美女h网站 | 亚洲精品天堂自在久久77 | 天天爽视频 | 99精品久久久久久 | 波多野结衣在线观看一区 | 黄色三级毛片 | 欧美日韩亚洲一区二区三区 |